Services

Tips and Lagoon Design

The management of quarrying and mineral processing waste is an integral part of quarry design and planning. GWP are acknowledged pioneers of design solutions for the management of both solid and liquid site-derived wastes.

Solid tips are carefully located, scaled, and designed in balance with the viable mineral extraction. Lagoons (attenuation and siltation complex) are designed to protect the environment and to be secure for whole of life.

GWP advise on the optimum approach for site-derived wastes throughout the quarry life cycle and its use for progressive restoration and/or final restoration states.

GWP Quarry Waste Consultants

Jeremy Baldock

Partner and Geotechnical Engineer

Dr. David Jameson

Partner, Head of Earth Resources and Principal Engineering Geologist

Ben Mason

Associate Partner and Geotechnical Engineer

Edward Bosley

Geospatial Analyst

Get in touch:

Email info@gwp.uk.com
Call +44 (0) 1608 810374

Contact us